A Home Owners Association established in terms of Section 29 of the Land Use Planning Ordinance, No 15 of 1985.
No matching sections. Try a different word or clear your search to read the full document.
Introduction#
These Guidelines have been compiled to ensure that the indigenous Flora are not disturbed or damaged during the building process as well as to ensure that damage to roads and streetlights are avoided.
The Owner of an Erf on which there are building operations should accept full responsibility for the actions of his building contractor as well as for the actions of the workers of his building contractor during the building period and should ensure that the aforementioned persons comply, at all times, with all the rules, especially with rules pertaining to the security of Fijnbos Paradijs.
A. Important points#
An approved architect must approve plans for both new buildings as well as for additions. Only approved building contractors may be used. Only approved building plans may be used.
A deposit of R2000-00 is payable by the Builder to the Fijnbos Paradijs Homeowners’ Association which shall be refunded once the Builder adhered to all these Guidelines.
Access to Fijnbos Paradijs is controlled and Owners are requested to ensure that the contractor and his workers access and exit in an orderly manner. No workers are allowed to sleep on the premises.
Working hours are restricted and no contractor or his workers shall be allowed beyond these times:
| Day | Working hours / conditions |
|---|---|
| Mondays to Fridays | 07h00 to 18h00 |
| Saturdays | 08h00 to 16h00 |
| Sundays | No work |
| Public Holidays | No work on religious holidays. For other public holidays, builders must apply in advance for approval of trustees |
Workers are not allowed to leave the premises where they work, except for going to the shop and with permission of his supervisor in other words, walking around in the complex without a good reason is forbidden.
The building site must always be neat and building debris must be removed regularly. Empty cement bags or plastic bags must be properly disposed of.
Check the slope of the land on the premises before building starts. Consult the Architectural Design and Building Guidelines. A contour plan may be required.
It is the Owner’s responsibility to get a copy of the Architectural Design and Building Guidelines as well as a copy of the Environmental Management Plan.
The guidelines as set out in the Environmental Management Plan (EMP) should always be adhered to.
Negligence to comply with these Guidelines is punishable with a fine of up to R10 000.
No vehicles may leave the roads except at the planned motor driveway to the premises. All vehicles must stay on the roads, in other words, not drive on the sidewalks or on any other place. The speed limit is 15 km per hour.
A responsible person (supervisor) must be pre -nominated by the contractor and should always be on the premises.
Stock and materials must be professionally managed. No materials are allowed outside premises boundaries without written consent from the owner of the erf.
Paint colours must be submitted to the Committee in advance for approval.
Sewage discharge pipes should be hidden inside walls.
No white garage doors or white PVC gutters or discharge pipes are allowed.
A legal toilet connection must be obtained from the Municipality before any building work begins.
A telephone/ fibre connection may not be available on the premises and it may be necessary to obtain a connection over an adjacent premises or road from the nearest telephone box or manhole. This may cause damage to existing or future driveways. It is therefore recommended that in such cases pipes are installed under driveways to facilitate future connection to adjacent premises.
If there isany uncertainty, consult the Chairman of the Homeowners’ Association.
B. Building structures#
1. Development guidelines#
Buildings
Placement of houses and site planning. Street views with different vertical level depths should be made to prevent a street from consisting of a wall of buildings. This will cause more private areas to be created around homes and views will be promoted. Factors such as views, privacy and sufficient sunlight should be considered when buildings are planned on premises. Efficient screens must be provided between homes to promote privacy.
Building Lines
| Requirement | Specified limit |
|---|---|
| Main building lines of complex | 3 m |
| Internal building lines of each Erf | |
| Street | 2 m |
| Lateral building lines | 1,5m |
| Rear building lines | 1,5 m |
| Cover | 60% of Erf size (maximum) |
| Height restriction | 8 m (ground floor and first floor) |
| Minimum building area | 80 sq/m (garages and outbuilding excluded) |
Levels Structures and levels of structures must follow the slope of the natural soil so that excessively high foundation walls can be avoided. Excavations should be minimized at the same time and not be deeper than 1,2m to form platforms.
Source diagram notes: the illustrations label an overall height of “8m max” and a ground-level dimension of “1,2m max”. They show acceptable building levels following the natural slope, and contrast this with an unacceptable level platform across sloping ground.
2. Exterior walls#
Tall bare walls should be avoided.
Materials:
- Plastered walls
- Patch and paint: Earthy colours (to be specified)
- The use of “Smartstone” should be limited
Note:
No wooden houses allowed
No ornamental stones allowed
No Spanish patchwork allowed
No fibre cement or wooden building planking
3. Windows#
Windows must be arranged proportionally as per approved building plan.
Materials:
- Hardwood frames (painted or varnished)
- Aluminium (epoxy coated)
- Burglar bars should be of rectangular, simple designs and mounted inside.
- See-through burglar bars of polycarbonate are allowed.
No steel window frames are allowed.
4. Doors#
Kitchen doors and storeroom doors must open onto a yard area and should not be visible from the front.
Materials:
- Hardwood (painted or varnished)
- Glass and aluminium.
- Garage doors maximum 4,8m wide and 2,5 m high. Hardwood, fibreglass or Chromadeck is allowed.
5. Balconies and verandas#
Handrails should be of simple design.
Material:
- Hardwood (painted or varnished)
- Aluminium, glass and aluminium, or galvanized epoxy coated metal (earthy colours)
6. Roofing#
Roofs with a minimum of 17,5 degrees and a maximum of 30 degrees will be allowed.
Fascia boards should be measured at a maximum height of 5m from the ground floor to the bottom of the fascia board.
Maximum roofing span should not exceed 8,5 m (interior size).
Flat concrete roofs may be used to connect other roofs.
Material:
- Cement tile roofs to match the style.
- The roofs should be natural (earthy) colours.
7. Fascias, barge boards and gutters#
Fascias of 225 mm fibre cement or 114 x 38 mm dark varnished wood.
Barge boards from cement tiles.
Gutters: Pre-painted seamless aluminium gutters and 75 mm square discharge pipes.
The colour of gutters and drainage pipes should be earthy colours.
Rainwater discharge should be distributed evenly on the premises to prevent erosion.
8. Yard walls and boundary walls#
Yard walls and boundary walls should be of the same material as the main building with a maximum height of 2m.
Plastered yard walls must be trimmed with a patch strap on top
Allwalls should be clearly indicated on plans.
Refuse bins, washing lines, gas bottles must be, as far as possible, out of sight from other units as well as common property
Boundary walls may only be erected from the frontal facade of the house to the back and must also be of the same material as the main building.
No pre-cast concrete walls are allowed.
9. Court yard gates#
The gate should be the same height as the court yard wall.
The following examples can be used as a guideline
The source document’s photographic gate examples have been omitted from this web version.
10. Paving and driveways#
Material:
- Claystone paving.
- Cobble paving.
- Cement stone paving with natural colours.
- No striped or mixed paving.
11. Carports#
The following specifications for a carport are applicable:
- 75 x 75 galvinize postframe
- 226 x 38 ricestix
- Roof : AX 150 color plus 225 facerboards and bargeboards to finish off
- IBR Clear Roof Sheets
12. Services#
All plumbing pipes must be inside walls.
Toilet ventilation pipes should be avoided.
Airvalves should be used.
13. Aerials, satellite dishes and solar panels#
Must be fixed to buildings and, as far as possible, out of sight.
14. Vegetation#
The indigenous coastal and fynbos flora in Fijnbos Paradijs should be preserved and protected as far as possible. These species are well adapted to this climate and therefore require little maintenance. The indigenous flora is part of this development.
15. Consultants’ boards#
In accordance with HOA’s directives, only one consultant board shall be allowed to be put up/shown at a building site/on the premises during the building process. No other subcontractor or advertising boards shall be allowed.
16. Requirements for approval of building plans#
1:200 site plan on which built yard walls, paving and boundary walls are indicated.
1:100 floor plans
1:100 or 1:50 cross-section
1:100 views
All other plans as required by Mossel Bay Municipality.
In case of minor works to be performed at unit, municipal guidelines and procedures apply. Application to be submitted at municipality on the relevant form and accompanied by the documents specified.
Full colour scheme and materials description.
17. The design overview process#
The Architects Review Committee (ARC) shall consist of the controlling architect and 2 (two) Members of the Homeowners’ Association.
Architects can obtain documentation and plans regarding the relevant premises at the HOA or at the Mossel Bay Municipality.
Sketch plans must first be submitted to the HOA for preliminary approval to prevent unnecessary wastage of time.
Final Municipal plans must be signed by the HOA before plans are submitted to the Municipality.
Plans must be submitted in triplicate to the HOA 14 (fourteen) days before the planned municipal submission date.
These Design Guidelines do not replace either the National Building Regulations or the Municipal Regulations.
A builder’s deposit of R2000-00 must be paid to the HOA for building rubble removal, road damage and environmental damage (refundable to the builder after final inspection by the HOA).
Each design shall be dealt with on its own merits.
18. Building contractors#
Only approved and NHBRC registered building contractors to be used by owners for new building projects or building alterations.
All conditions as per the requirements of the HOA to be adhered to e.g. NHBRC registered. Three references from previous building projects to be provided.
Documentation to be submitted to HOA prior to commencement of project includes identity documents of employees.
All municipal guidelines and regulations in terms of safety must be strictly adhered to. Minor Building Works applications must be submitted where applicable. Please contact the Municipal Building Department at 044 606 5246 if in doubt.